MHI Vestas Offshore Wind's Optimise Manufacturing Operations with Dynamics 365

DOWNLOAD CASE STUDY PDF Book a call
MHI Vestas Offshore Wind Case Study

Explore how MHI Vestas Offshore Wind collaborated with Pragmatiq to enhance their blade painting manufacturing process by establishing a new paint factory and extending their Microsoft Dynamics platform, resulting in significant savings and operational expansion.

Background & Challenges

Background:

MHI Vestas Offshore Wind, formed from a joint venture between Vestas Wind Systems and Mitsubishi Heavy Industries in 2014, is a leading manufacturer of wind turbines. The company is known for designing, manufacturing, installing, and servicing wind turbines worldwide. Their manufacturing footprint includes producing 80-metre wind turbine blades on the Isle of Wight.

Challenges:

  • Costly Shipping Process: Previously, manufactured blades were shipped to Denmark for painting, incurring high costs and logistical challenges.
  • Platform Extension: Needed to extend the Microsoft Dynamics platform to manage new operations and link them seamlessly with existing processes on the Isle of Wight.
  • Tight Implementation Timeline: The implementation had to be completed within just over four months to meet increasing production demands.
MHI Vestas Offshore Wind Case Study

The Solution & Implementation

Discovery and Planning:

Pragmatiq began by assessing MHI Vestas’ existing operations and Dynamics platform. This involved close collaboration with the MHI Vestas team to understand their needs and operational workflows.

Execution:

  • Solution Design: Developed a solution on top of the existing Dynamics platform that mirrored and extended current operations to include the new paint facility.
  • Production Planning & Logistics: Enhanced control over manufacturing processes.
  • Inventory Management: Streamlined management of component supply and consumption.
  • Enterprise Asset Management: Ensured equipment uptime and efficiency.
  • Time & Attendance: Improved tracking of production workers’ time.
  • User Training: Delivered comprehensive training across all functional areas, including classroom sessions, one-on-one training, and two weeks of onsite hyper-care support post go-live to address any arising issues.
MHI Vestas Offshore Wind Case Study

The Transformation

Results:

  • Operational Expansion: The new Dynamics platform enabled MHI Vestas to double the output at their Isle of Wight factory with the solutions flexible nature.
  • Meeting Demand: Dynamics 365 scalability enhanced operations allowed MHI Vestas to confidently meet growing customer demand.
  • Pipeline Accuracy: Improved visibility into their production pipeline, enhancing customer relationships and business growth.

Contact us today to see how we can help transform your organisation with expert Dynamics CRM consultancy and support.

Read full case study here
MHI Vestas Offshore Wind Case Study

Contact us to find out how we can support your business

Please complete the form below and a member of our team will get back to you shortly.

"*" indicates required fields

This field is for validation purposes and should be left unchanged.